Kitchen & Structural Transformation
A full kitchen transformation underpinned by major structural work. Load-bearing walls were opened up and new steel beams installed to engineer's spec, with foundations and floor works carried out under building control sign-off. The original kitchen was stripped back and re-plastered before the new handleless units, quartz worktops, island and bi-fold doors went in, and the space was fitted out and finished.
- Location
- Bootle, Merseyside
- Duration
- 6 weeks
- Scope
- Kitchen & Structural










